Our vision

Brookfield Avenue is a Kāinga Ora development delivering 16 social homes in Onehunga. The project kept moving through regulatory change, COVID-19 disruption and difficult ground conditions, while holding on to strong design outcomes and enhanced healthy homes standards.

Rather than compromising outcomes, the project elevated them, setting a benchmark for well-designed social housing while navigating change, uncertainty, and programme pressure.


Project details

Contract value

$5.5m

Completed

July 2020

Certification

Homestar 6

Size

1,220m²

Homes

16 (1–2 bedroom mix, walk-up and duplex typologies)

Housing mix

100% Social housing

Awards

2021 New Zealand Institute of Architects

Auckland – Category Winner

Brick and timber street frontage of the Brookfield Avenue apartments
Dark-clad three-storey Brookfield Avenue apartments from the street, Onehunga

Project partners

Architecture

Monk Mackenzie

Structural engineer

SENZ

Civil engineer

Bonisch

Services engineer

Norman Disney Young


Technical performance

Efficient services integration

Alternative design approaches for routing services within ceiling spaces and risers improved coordination across trades and supported efficient delivery.

Acoustic performance

Wall and flooring systems were designed to achieve strong inter-tenancy acoustic separation, enhancing privacy and resident comfort.

Site constraints & complexity

Regulatory change during construction

Significant changes to passive fire standards post-consent required major redesign and rework during construction, managed through proactive coordination and adaptive delivery.

Critical infrastructure disruption

Delays in relocating a power pole impacted scaffolding and cladding works, mitigated through resequencing and adjusted methodologies.

External disruptions (COVID-19)

Construction was impacted by COVID-19 lockdowns and international supply chain disruptions, requiring agile planning and responsive programme management.

Challenging ground conditions

Additional earthworks were required due to site ground conditions, increasing complexity and requiring adaptive construction planning.

Landscaped paths between the Brookfield Avenue apartment buildings

Engineering & resilience

Pre-resolved design efficiency

With engineering largely resolved during the design phase, construction focused on efficient execution and rapid response to emerging challenges.

Infrastructure upgrades

Installation of a new transformer and coordination of local infrastructure upgrades ensured long-term performance and service capacity for the development.


Design & delivery

Programme recovery & resequencing

Construction sequencing was adapted in response to external disruptions, enabling continued progress and minimising delays.

Architectural quality in social housing

The development delivers well-designed, visually appealing social housing that goes beyond standard expectations.

Value engineering in practice

Ongoing value engineering ensured cost control while maintaining design integrity and performance outcomes.

Aerial view of the Brookfield Avenue apartments in Onehunga, Auckland

Explore our projects

Victoria Street, 
Auckland

Victoria Street, Auckland

$3m 12 apartments Homestar 6 Completed 2020
Hutt Road, 
Manurewa

Hutt Road, Manurewa

$7m 21 apartments Homestar 6 Completed 2023
Te Pākau Maru, 
Christchurch

Te Pākau Maru, Christchurch

$23m 63 homes Homestar 7 Completed 2025
Kia koa te Whenua, Christchurch

Kia koa te Whenua, Christchurch

$3.5m Office space 11-month build Completed 2024
Karamū, 
Christchurch

Karamū, Christchurch

$22m 84 homes Homestar 6 & 7 Completed 2022
High & White Street, 
Rangiora

High & White Street, Rangiora

$7m 28 homes Homestar 6 Completed 2019
Tai Tapu, 
Canterbury

Tai Tapu, Canterbury

Geothermal Private home 4 bedrooms Completed 2015
Arbor Green, 
Rolleston

Arbor Green, Rolleston

$3.4m 10 homes Homestar 6 v5 In progress
Tasman Holiday Park, 
Miranda

Tasman Holiday Park, Miranda

6-month build Live build environment Completed 2026
Bell Road, 
Auckland

Bell Road, Auckland

$1.5m Private home 260m² Completed 2025