Services delivered
Our vision
Victoria Street is an off-site manufacturing project delivering 12 social housing apartments in Auckland. It was built using a pilot modular system, supported by digital coordination and integrated delivery.
Strong collaboration across the design, engineering and construction teams worked through the challenges of a pilot system, with no compromise on design intent or occupant wellbeing.
Project details
Contract value
$3m
Size
1,404m²
Completed
June 2020
Homes
12 (two and three-bedroom apartments)
Certification
Homestar 6
Housing mix
100% Social housing
Project partners
Client
IMB / Kāinga Ora
Architecture & landscaping
Intro Architects
Structural engineer
CGW
Civil engineer
Envivo
Technical performance
Off-site manufacturing system
Fully modular construction using prefabricated closed panels with high precision and efficiency.
Digital design & coordination
Revit-enabled 3D modelling integrating architecture, structure, services, and prefabrication coordination.
Acoustic performance
The apartments were designed for strong acoustic performance, for resident comfort.
Build programme
The prefabricated panels allowed each building to be closed in within a week.
Site constraints & complexity
Integration of multiple prefabricated systems
Bringing several off-site components together needed careful coordination and QA.
Façade remediation within programme constraints
Façade remediation was resolved without affecting the critical path.
Engineering & resilience
Precision engineering & tolerances
Achieved tight slab tolerances (1–3mm), door threshold compliance, and balcony fireproofing requirements.
Integrated consultant collaboration
Close coordination across civil, structural, and architectural packages streamlined delivery.
Design & delivery
Early contractor involvement (ECI)
Enabled early alignment of design and prefabrication strategy.
Off-site manufacturing pilot approach
The pilot was developed with Auckland Council's OSM team, supported by custom QA systems.
Advanced planning & communication
Early planning and clear communication reduced delivery risk and made room to try new approaches.
Quality assurance
Custom QA systems supported the build, and no defects were recorded during the liability period.