Skip to content

The Residences at Karamū

Broomfield
Ōtautahi Christchurch

Aerial view of The Residences at Karamū at sunset, Christchurch

Our vision

The Residences at Karamū brought 84 homes to Broomfield, Christchurch, with first-home buyer, social and mixed ownership homes side by side. Five duplex and terraced typologies, each with its own cladding and colour combination, give the street real variety.

The project was delivered on time, on budget and fully presold, and supported around 475 workers along the way. Homes are using 23 to 34% less electricity, saving residents around $540 to $800 a year.


Project details

Contract value

$22m

Completed

2022

Certification

Homestar 6 & 7

Size

11,600m²

Homes

84 (5 distinct duplex and terraced typologies)

Housing mix

35% first-home buyers
33% social housing
32% mixed ownership

Awards

2023 Property Council New Zealand

Community & Affordable Housing Property Award – Excellence & Best in Category

Street frontage of terraced homes with garages at The Residences at Karamū
“I’m a single mum with three under three. Karamū meant I could provide stability for them. I have somewhere to call home, instead of going back to a motel every day.”
Karamū resident
Kitchen in a home at The Residences at Karamū

Project partners

Development manager

Kāinga Maha

Structural engineer

Blueprint Consulting Engineers

Architecture & landscaping

Foley Group

Service engineer

Bonisch

Mechanical engineer

Moisture Master

Investor partner

Home Capital Partners

Surveyor

Mainland Surveying

Property & tenancy management

Te Wawata Kāinga


Technical performance

Homestar 6 & 7 certified

High energy efficiency and occupant comfort aligned with NZGBC standards.

Energy efficiency outcomes

Homes use 23 to 34% less electricity, saving residents around $540 to $800 a year.

Climate positive design

501 tonnes of CO₂e were offset across 28 homes through credits and native planting.

Site constraints & complexity

Large-scale coordination

Managing multiple typologies and stakeholders required strong sequencing and coordination.

Affordability vs quality

Maintaining design quality while achieving below-market pricing required disciplined delivery.

Terraced homes with black fencing along a footpath at The Residences at Karamū

Engineering & resilience

Sustainable urban planning

Long-term environmental performance embedded in design decisions.

Scalable delivery model

Repeatable construction approach supports future developments.


Design & delivery

Mixed-tenure integration

Seamless integration of social, affordable, and private ownership.

Architectural diversity

Each home has its own cladding and colour combination, so no two look the same.

Programme & sales performance

The project was delivered on time and on budget, and every home was presold.

Economic impact

Around 475 workers were involved in delivering the project.

Street of brick and weatherboard homes at The Residences at Karamū, Christchurch

Explore our projects

Kia koa te Whenua, Christchurch

Kia koa te Whenua, Christchurch

A purpose-built office in Hornby designed around collaboration and staff wellbeing. Its steel structure carries a 9m by 9m glazed frontage, with value engineering keeping the build on budget.

$3.5m Office space 11-month build Completed 2024
High & White Street, 
Rangiora

High & White Street, Rangiora

Twenty-eight fully accessible social homes, one of the largest Kāinga Ora developments in North Canterbury, with 50% of the project finished ahead of schedule.

$7m 28 homes Homestar 6 Completed 2019
Tai Tapu, 
Canterbury

Tai Tapu, Canterbury

An award-winning private residence of three offset wings joined by a central gallery. Geothermal heating and flush-finished cladding called for precise construction on a condensed programme.

Geothermal Private home 4 bedrooms Completed 2015
Brookfield Avenue, 
Onehunga

Brookfield Avenue, Onehunga

Sixteen award-winning social homes for Kāinga Ora, delivered through mid-build passive-fire rule changes and COVID-19 lockdowns. The one- and two-bedroom homes are a mix of walk-ups and duplexes.

$5.5m 16 homes Homestar 6 Completed 2020
Arbor Green, 
Rolleston

Arbor Green, Rolleston

Ten high-performance townhouses built with off-site manufacturing and SIPs. Designed to Homestar 6 v5 standards, using up to 50% less energy than the Building Code requires.

$3.4m 10 homes Homestar 6 v5 In progress
Te Pākau Maru, 
Christchurch

Te Pākau Maru, Christchurch

An award-winning, multi-stage development bringing 63 blind mixed-tenure homes to New Brighton, designed around the needs and aspirations of the local community.

$23m 63 homes Homestar 7 Completed 2025
Tasman Holiday Park, 
Miranda

Tasman Holiday Park, Miranda

An upgrade and expansion of a holiday park that stayed open throughout the build. Six elevated cabins and a new pool precinct were delivered in six months on ground fed by natural springs.

6-month build Live build environment Completed 2026
Victoria Street, 
Auckland

Victoria Street, Auckland

Twelve social housing apartments built from prefabricated closed panels. Each building was weathertight within a week, and the project recorded zero defects during the defects liability period.

$3m 12 apartments Homestar 6 Completed 2020
Bell Road, 
Auckland

Bell Road, Auckland

A high-spec architectural home on a steep site with a 10m fall and a narrow 150m driveway. A split concrete and timber foundation on 9m piles kept earthworks to a minimum.

$1.5m Private home 260m² Completed 2025
Hutt Road, 
Manurewa

Hutt Road, Manurewa

Twenty-one social housing apartments on a compact site. Home Construction led the project from concept design and consenting through to construction and final compliance.

$7m 21 apartments Homestar 6 Completed 2023