Skip to content

Jackson Street

Petone
Wellington

jackson-st-2-full-width-image-medium.jpg

Services delivered

Our vision

Jackson Street is a remediation project covering 36 units across three-storey walk-up apartment blocks. Home Construction delivered the work as part of a larger development the team worked through over four years.

Alongside the repairs, the project added measures to keep the buildings dry and sound over the long term. Sensors now track moisture inside the walls, and one block trialled an external insulation and cladding system. The block closest to the river was given a strengthened foundation.


Project details

Contract value

$15.3m

Size

Approx 5,000m²

Completed

March 2024

Homes

36 units (across 3 three-storey walk-ups)

jackson-st-1-full-width-image-medium.jpg
jackson-st-1-portrait-image.jpg

Project partners

Client

Kāinga Ora

Architecture & landscaping

Architecture Cubed Ltd

Structural engineer

Spencer Holmes

Civil engineer

Envivo

Construction partner

We Build Construction Ltd

Other consultants

Stephenson and Turner (services)
Aotea Security
ATL HVAC


Technical performance

Moisture monitoring

Wi-Fi-connected sensors were installed in internal and external wall and ceiling cavities. They track temperature and humidity changes before and during occupation.

External insulation trial

One block was converted to external insulation with a new overlay cladding system. The trial moves the dew point outside the poured in-situ concrete walls.

Central HVAC system

A central HVAC system was installed.

Fully wrapped blocks

Each block was scaffolded over and fully wrapped during construction.

Site constraints & complexity

Staged delivery over four years

The blocks were part of a larger development that the team worked through over four years.

Occupied neighbouring blocks

The other blocks in the development stayed occupied throughout construction.

jackson-st-2-portrait-image.jpg

Site constraints & complexity

Strengthened foundations near the river

One block of apartments sat very close to the river, so drawing on lessons from properties beside waterways in the Christchurch earthquakes, the team added piles around the perimeter and under the structure, and extensively upgraded and strengthened the foundation system.

Explore our projects

Brookfield Avenue, 
Onehunga

Brookfield Avenue, Onehunga

An award-winning sixteen social homes in Onehunga for Kāinga Ora, delivered through mid-build passive fire rule changes and COVID-19 lockdowns. The one- and two-bedroom homes are a mix of walk-ups and duplexes.

$5.5m 16 homes Homestar 6 Completed 2020
Kia koa te Whenua, Christchurch

Kia koa te Whenua, Christchurch

A purpose-built office in Hornby designed around collaboration and staff wellbeing. Its steel structure carries a 9m by 9m glazed frontage, with value engineering keeping the build on budget.

$3.5m Office space 11 month build Completed 2022
The Residences at Karamū, Christchurch

The Residences at Karamū, Christchurch

An award-winning 84-home mixed-tenure development offering first-home buyer, social and mixed ownership homes, delivered on time and on budget across five housing typologies.

$42m 84 homes Homestar 6&7 Completed 2022
High & White Street, 
Rangiora

High & White Street, Rangiora

Twenty-eight fully accessible social homes, one of the largest Kāinga Ora developments in North Canterbury, with half of the homes finished five months ahead of schedule.

$7m 28 homes Homestar 6 Completed 2019
Tai Tapu, 
Canterbury

Tai Tapu, Canterbury

An award-winning private residence of three offset wings joined by a central gallery. Geothermal heating and flush-finished cladding called for precise construction on a condensed programme.

Geothermal Private home 4 bed Completed 2015
Te Pākau Maru, 
Christchurch

Te Pākau Maru, Christchurch

An award-winning multi-stage, blind mixed-tenure development bringing 63 new homes to New Brighton, designed around the needs and aspirations of the local community.

$23m 63 homes Completed 2025 Homestar 7
Arbor Green, 
Rolleston

Arbor Green, Rolleston

Ten high-performance townhouses in Rolleston. Off-site manufacturing and SIP panels target Homestar 6 and energy use up to 50% better than building code.

$3.4m 10 homes Homestar 6 In progress
Tasman Holiday Park, 
Miranda

Tasman Holiday Park, Miranda

An upgrade and expansion of a holiday park that stayed open throughout the build. Six elevated cabins and a new pool precinct were delivered in six months on ground fed by natural springs.

6-month build Live build environment Completed 2026
Bell Road, 
Auckland

Bell Road, Auckland

A high-spec architectural home on a site with a 10-metre fall and a 150-metre driveway. A split concrete and timber foundation on 9m piles kept earthworks to a minimum.

$1.5m Private home 4 bed In progress
Hutt Road, 
Manurewa

Hutt Road, Manurewa

Twenty-one social housing apartments on a compact Manurewa site. Home Construction led the project from concept design and consenting through to construction and final compliance.

$7m 21 homes Homestar 6 Completed 2023